St. Brigid’s Church, Templebraden, Co. Limerick

March 21st, 2017

St Brigid’s Church in Templebraden is one of two churches in Pallasgreen, the other being Nicker Church. Templebraden project in 2015 consisted of a complete outer envelope conservation including roof reslating, rainwater goods, belfry repairs, lightning conductors, external lime pointing, stonework repairs, stained glass repairs, external drainage and paving, roof insulation. Internal works included painting, […]

Nicker Church at Pallasgreen, Co. Limerick

March 21st, 2017

Nicker Church is one of two churches in Pallasgreen, the other being St Brigid’s Church at Templebraden. Nicker Church project in 2011 consisted of a complete outer envelope conservation. This included roof reslating in natural slate, rainwater goods, flat roof weathering replacement, insulation, repairs to roof trusses and corbels, timber decay, belfry, lightning conductors, stonework, […]

MTI Building, O’Connell Ave, Limerick

March 21st, 2017

External envelope works including rebuilding the stone aedicule over the main entrance. A temporary access route was arranged to provide for safe working. The stone aedicule was unstable and was dismantled and removed to ground level to repair the stones. At roof level structural repairs were carried out to stabilise the support for the aedicule. […]

Castle Oliver, Ardpatrick, Limerick

March 21st, 2017

Caplan Construction has carried out various roof and internal works to Castle Oliver between 2006 and 2012. The works included reslating of the entire roof with associated works to roof timbers, internal gutters, flashings, gutters, valleys, dormers, towers, insulations, sandstone chimney repointing. Internal works included remedial works to floors and ceilings, some internal joinery.

Annamult House, Bennetsbridge, Kilkenny

March 21st, 2017

Annamult House is a Tudor Revival house extended in later years by subsequent owners. In 2010 the house suffered a devastating fire which destroyed the entire roof and completely gutted one wing of the house and severely damaged the remainder. The restoration project was carried out over 2 years in two stages. The roof was […]